Photo Staging — June 2026 Job

Five optimized photos from the 2026-06-05 job, staged into three pages for your review. None of these are visible on the live site. Approval-publish moves them from /preview/ to live paths.

Mold Inspection & Removal Page

/preview/mold-inspection-removal/

New "What Hidden Mold Actually Looks Like" section added between main content and service coverage. Lead photo + 4-photo grid showing the full remediation story.

5 photos: subfloor mirror evidence (lead), baseboards pulled, containment, HEPA scrubber, drying setup.

Water Damage Restoration Page

/preview/water-damage-restoration/

New "What Our Restoration Work Looks Like" section added between main content and Common Causes. Focused on IICRC S500 workflow: containment → HEPA filtration → drying.

3 photos: containment, HEPA scrubber, drying setup.

Blog Post: How to Spot Hidden Mold

/preview/blog/how-to-spot-hidden-mold-after-water-damage/

Three photos integrated inline with existing text. Article schema + OG image + Twitter card updated to use baseboards photo as the social share image instead of the logo.

3 photos: baseboards (hero), subfloor mirror, containment.

Notes Before Publishing